
U.S.S.R.EliteLestaRiga
WoWS World of Warships U.S.S.R. Cruiser · Tier IX
- Main Battery
- 220 mm/60 on an SM-7 mount
- 3 turrets × 3 barrels
- Range 16.4 km
- Secondaries
- 100 mm/56 on a B-54 mount
- Secondaries
- 130 mm/55 on a B-2-U mount
- Range 6.95 km
Specifications
Survivability
Main Battery
Secondary Battery
AA Defense
Maneuverability
Concealment
Consumables

Extinguishes fires, removes instances of flooding, and repairs damaged modules. Prevents enemy acoustic torpedoes from homing.

Partially restores the ship's HP by repairing any light damage.

Increases the range of assured acquisition of enemy ships and torpedoes, including those within smoke screens.

Increases the intensity of AA fire.

Significantly increases the range of assured acquisition of ships and submarines on the surface, including those within smoke screens.

Follow the ship and automatically attack enemy aircraft. Can attack Airstrike squadrons multiple times before returning to the ship. Cannot spot enemy ships.

Extends main battery firing range.

Carries out aerial bombardment of the marked area with depth charges. Depth charges can hit enemy submarines. They also have chances of causing fire, flooding, and incapacitating modules. Increased chances of incapacitating sonar. Effective against enemy mines. Cannot spot enemy ships.
Ballistics
Armor Model
Overview
After Soviet specialists studied the technical documentation of the cruiser Lützow, purchased from Germany, the question arose of creating more advanced ships based on the German project. On the instructions of the People's Commissar of the Navy, Admiral N. G. Kuznetsov, the Main Naval Staff prepared a preliminary operational-tactical assignment for the design of such a cruiser, which received the project index 82. The operational-tactical assignment was repeatedly adjusted, and the development was initially carried out by TsKB-17, and then by TsKB-16. The technical project was approved in February 1951, and in December of the same year, the cruiser 'Stalingrad' was laid down at Plant No. 444 in Nikolaev. The launch was planned for 1953, but after changes in the country's leadership, the construction of ships of this project was canceled.
