
U.S.S.R.PremiumLestaKronshtadt
WoWS World of Warships U.S.S.R. Cruiser · Tier IX
- Main Battery
- 305 mm/54 B-50 on an MK-15 mount
- 3 turrets × 3 barrels
- Range 18.2 km
- Secondaries
- 152 mm/57 B-38 on an MK-17 mount
- Secondaries
- 100 mm/56 B-54 on an MZ-16 mount
- Range 6.95 km
Specifications
Survivability
Main Battery
Secondary Battery
AA Defense
Maneuverability
Concealment
Consumables

Extinguishes fires, removes instances of flooding, and repairs damaged modules. Prevents enemy acoustic torpedoes from homing.

Partially restores the ship's HP by repairing any light damage.

Extends main battery firing range.

Increases the intensity of AA fire.

Significantly increases the range of assured acquisition of ships and submarines on the surface, including those within smoke screens.

Carries out aerial bombardment of the marked area with depth charges. Depth charges can hit enemy submarines. They also have chances of causing fire, flooding, and incapacitating modules. Increased chances of incapacitating sonar. Effective against enemy mines. Cannot spot enemy ships.
Ballistics
Armor Model
Overview
In August, the Defense Committee under the Council of People's Commissars decided to build heavy cruisers with 254 mm main battery artillery instead of Type B battleships. In September 1937, the commission developed a tactical-technical assignment for the new ship. The development of the preliminary design, which received the index 69, was carried out by TsKB-17. In connection with the construction of ships of the Scharnhorst class in Germany, the cruiser's main caliber was revised in favor of increasing to 305 mm. In 1938, the project was adjusted again with enhanced armor, and in January 1939, the preliminary design was presented to the Defense Committee. In November 1939, two heavy cruisers were laid down—in Leningrad and Nikolaev. But the domestic industry was loaded with military orders and could not cope with the supply of armament and equipment for the ships, and with the beginning of the Great Patriotic War, construction was completely stopped. After the end of the war, there were projects to complete the heavy cruisers as aircraft carriers, but these plans were not realized.
