
U.S.S.R.EliteCommonGlobalPobeda
WoWS World of Warships U.S.S.R. Aircraft Carrier · Tier VIII
- Secondaries
- HE-46
- Range 4.5 km
Specifications
Pobeda Win Rate & Combat Stats
Sample of 495.2K players · as of 2026-10-15Averages from our own crawled player sample, not official server-wide data. The sample skews toward active clan players, so its overall win rate runs about 1 point above the true server average. Battle counts are career totals and include games played before this ship’s past balance changes.
Survivability
Secondary Battery
AA Defense
Maneuverability
Concealment
Aircraft
Consumables

Extinguishes fires, removes instances of flooding, and repairs damaged modules. Prevents enemy submarine-launched torpedoes from homing.

Follow the ship and automatically attack enemy aircraft. Can attack Airstrike squadrons multiple times before returning to the ship. Invulnerable against hostile fighters, do not attack them, and cannot spot enemy ships.

Carries out aerial bombardment of the marked area with depth charges. Depth charges can hit enemy submarines. They also have chances of causing fire, flooding, and incapacitating modules. Increased chances of incapacitating sonar. Effective against enemy mines. Cannot spot enemy ships.
Pobeda Change History
Torpedo bomber squadron parameters changed
- Buffstock aircraft preparation time95 → 90 s
- Buffresearchable aircraft preparation time109 → 103 s
Attack aircraft squadron parameters changed
- Buffstock aircraft preparation time67 → 63 s
- Buffresearchable aircraft preparation time76 → 72 s
Skip bomber squadron parameters changed
- Buffstock aircraft preparation time78 → 74 s
- Buffresearchable aircraft preparation time89 → 84 s
Armor Model
Overview
In April 1945, the scientific and technical committee filed an offer to the Soviet Naval Shipbuilding Bureau to finalize the construction of Kronshtadt-class heavy cruisers under Project 69I as aircraft carriers because building the ships under the initial project had already become pointless. It was intended for the ship to carry 76 airplanes. The project was codenamed 69AV. The offer wasn't implemented because the completion ratio of the hulls and associated hardware was low.
