Back to List













Pobeda
In April 1945, the scientific and technical committee filed an offer to the Soviet Naval Shipbuilding Bureau to finalize the construction of Kronshtadt-class heavy cruisers under Project 69I as aircraft carriers because building the ships under the initial project had already become pointless. It was intended for the ship to carry 76 airplanes. The project was codenamed 69AV. The offer wasn't implemented because the completion ratio of the hulls and associated hardware was low.
Specifications
Survivability
Hit Points53,200
Flood Damage34%
Ship Length255.1 m
Ship Width34.7 m
Secondary Battery
Secondary Guns6
Range4.5 km
AA Defense
Maneuverability
Max Speed33.5 knots
Turning Radius1090 m
Rudder Shift Time20.9 s
Concealment
Max Surface Detection13.41 km
Min Surface Detection10.86 km
Air Detection10.00 km
Submarine Detection10.00 km
Consumables
Damage Control Party
Cooldown70 s
Duration30 s
Charges∞
Catapult Fighter
Cooldown40 s
Duration600 s
Charges4
Aircraft
Fighter
Squadron Size
Skip Bomber
Squadron Size
Torp Damage1,200
0Torpedo Bomber
Squadron Size
Torp Damage500
Torp Speed41 knots
Torp Range0.2 km
Flood Chance33%
fighter_AB2_Fighter
Squadron Size
skip_bomber_AB2_SkipBomber
Squadron Size
Torp Damage1,500
0torpedo_bomber_AB2_TorpedoBomber
Squadron Size
Torp Damage600
Torp Speed41 knots
Torp Range0.2 km
Flood Chance39%
Modules
Pobeda (A)
Pobeda (B)
Propulsion: 231,000 hp
Yakovlev Yak-9U
Yakovlev Yak-1
Tairov Ta-3 (M-88)
Sukhoi Su-2 (M-82)
Upgrades
Slot 1
Auxiliary Armaments Modification 1
Air Groups Modification 1
Slot 2
Damage Control System Modification 1
Slot 3
Secondary Battery Modification 1
Slot 4
Damage Control System Modification 2
Slot 5
Flight Control Modification 1
Concealment System Modification 1
History
Coming Soon